Unfortunately you did not pass the ASSE 6030 final exam. Please contact MGA to arrange a retest date & time.
Congratulations! You have passed the ASSE 6030 final exam!
Medical gas outlets at a gauge pressure of 50 psi shall deliver ________ SCFM with a pressure drop of not more than ________ PSI
Medical air compressor source system tests shall be conducted at the _______________ of the med air system.
Please pair the correct NFPA 99 required % concentration requirements with the correct gas:
Nitrous oxide USP
|
|
Oxygen USP
|
|
Medical air USP
|
|
Nitrogen NF
|
|
Oxygen 93 USP
|
|
The medical gas verifier shall perform a ______ minute standing pressure test with the source valve and all zone valves closed.
Medical vacuum inlets shall draw _______ SCFM without reducing the vacuum level below _______ inHg at any adjacent station inlet.
The system verification must be performed after the installation of all manufactured assemblies supplied through flexible hoses.
The piping purge test shall be conducted to remove any traces of particulate matter in the pipeline as a result of construction. The purge rate shall be at least _______ SCFM
Medical support gas outlet shall deliver _______ SCFM with a pressure drop of not more than _______ PSI
No pronounced or objectionable odor shall be discernible from any positive pressure outlet.
The piping purge test must be conducted on each newly installed outlet as part of the final system verification.
Match the contaminant values with the correct contaminant parameters for the medical air contaminant testing required in the system verification portion of NFPA 99:
Halogenated hydrocarbons
|
|
Carbon dioxide
|
|
Carbon monoxide
|
|
Gaseous hydrocarbons
|
|
During the final tie in test, the verifier must check the final connection between the new work and the existing system with a leak detection solution that is safe for use with oxygen.
Oxygen and medical air outlets serving Category 1 spaces shall deliver a transient flow rate of ______ SCFM for 3 seconds.
The piping particulate test shall be conducted in _______ percent (%) of zones at the outlet most remote from the source.
If any outlet fails the piping particulate test, then the most remote outlet must be tested in _______ percent of zones.
The piping particulate test requires verifiers to flow a minimum of _______ cubic feet through a clean 0.45 micron filter at a minimum flow rate of _______ SCFM.
During the final verification of a medical air compressor source system the air quality tests shall be conducted with the source valve closed under a simulated load for _______ hours.
The ASSE 6010 installing contractor shall be able to verify their own work.
The filters used in the piping particulate test shall accrue no more than _____ mg of matter from any outlet tested.
The verifier piping purity test shall be conducted at the outlet most remote from the source of supply and compared to the source gas.
Cryogenic fluid central supply systems shall be verified by a technician technically competent in the field of cryogenic fluid systems and meeting the requirements of ASSE ________.